:: PRODUCTS
 
   NEW & EVENTS
     
     
     
     
     
     
     
     
     
 
 
 
 
     
 
  Car shifter in shaft
 
     
 
     
  With tunnel design to filling concrete inside as water pipe line tunnel... we do modify any type of concrete pump to fix with wheel to run on the rail.....  
     
     
 
         
 
     
 
     
     
 
B.N.K.ENGINEERING CO.,LTD.
Bangkok :  53/4  Mu 6  Kingkaw rd.,Rachateva,Bangplee Samutprakarn 10540  Thailand
TEL. +66(0)2 7389043-7   FAX :+66(0)2 7388004
 
Chonburi :  79 Mu.6  Sukprayoon rd., Nongtamlung,Pantong  Chonburi 20160 Thailand
TEL. +66(0)38 789666 +66(0)382 06999    FAX:+66(0)38 789444
E-Mail : tanidsorn@yahoo.com
 
© Copyright 2013 www.bnkengineering.com  All Rights Reserved
Current Pageid = 287